Skip to content

ALEXANDRIA NSW BRIDGE REPAIR PROJECT

  • by

We recently worked on a project for EPTEC PTY LTD involving the repair of the Alexandria Bridge at Ricketty Street for Sydney Transport. Our task was to document the bridge repair drawings for the concrete repair works with reinforcement repair details per the NSW government documentation procedure.

The project required a high level of technical expertise to understand the NSW government documentation procedure, the condition of the bridge, and the different methods of concrete and reinforcement repair. Effective communication with Sydney Transport authorities was also crucial to ensure the accuracy and completeness of the drawings.

I’m pleased to report that the project was a success. The bridge repair drawings were completed on time and within budget. By following the NSW government documentation procedure, we improved accuracy, reduced errors, enhanced communication between stakeholders, and increased safety and quality.

The specific tasks involved in the project included:

  • Understanding the documentation procedure.
  • Inspecting the bridge condition.
  • Developing repair drawings.
  • Preparing accurate representation drawings.
  • Reviewing and approving the drawings.
  • Procuring materials and equipment.
  • Constructing the repairs and testing and commissioning the repairs.

We support government and civil drafting projects, and please do not hesitate to contact us at any time. Our team of experts is always available to provide you with the necessary assistance and guidance.